Infrastructure

THE HUB OF SOPHISTICATION & EXCELLENCE


  Two plants: 30 cuM/Hr and 60 CuM/Hr, Fully Automated, digital controlled.

  2 Silos.

   Well maintained, 25 Transit Mixers each with 7 CuM capacity.

   6 Concrete Pumps with a capacity of 30 CuM/Hr.

  Monthly calibration of all equipments within the plant.

  All our inhouse lab equipments such as a computerized Testing Machines, Cube Moulds are calibrated each year.